edercoll
03-04-10, 03:52 PM
Hello,
As it is now, the grace period for an order to be overdue is set globally.
I have some products that need a short period as a due date and others I have to provide a longer period.
Is is possible to set this somehow so that it can be configured per product?
Or, is there a way for me to set a product to have its first billing date 30 days after the order, instead of an specific day of the month?
Any of the two would do the trick.
Thanks!
Eder
As it is now, the grace period for an order to be overdue is set globally.
I have some products that need a short period as a due date and others I have to provide a longer period.
Is is possible to set this somehow so that it can be configured per product?
Or, is there a way for me to set a product to have its first billing date 30 days after the order, instead of an specific day of the month?
Any of the two would do the trick.
Thanks!
Eder